现代完井工程 英文 🔍
万仁溥编, Renpu Wan, 万仁溥编, 万仁溥
北京:石油工业出版社, 2012, 2012
中文 [zh] · PDF · 72.5MB · 2012 · 📗 未知类型的图书 · 🚀/duxiu/zlibzh · Save
描述
1 (p1): INTRODUCTION 6 (p2): 1 Basis of Well Completion Engineering 6 (p3): 1.1 Grounds of Reservoir Geology and Reservoir Engineering 17 (p4): 1.2 Core Analysis Techniques 26 (p5): 1.3 Reservoir Sensitivity to Fluid and Working Fluid Damage Evaluation 43 (p6): 1.4 Reservoir Stress Sensitivity Analysis 59 (p7): 1.5 IN-SlTU Stress and Mechanical Parameters of Rock 69 (p8): 1.6 Technological Grounds of Petroleum Production Engineering 73 (p9): References 77 (p10): 2 Well Completion Mode Selection 77 (p11): 2.1 Vertical,Slant and Directional Well Completion 119 (p12): 2.2 Horizontal Well Completion 142 (p13): 2.3 Underbalanced Well Completion 148 (p14): 2.4 Basic Requirements,Grounds and Flow Chart of Well Completion Mode Selection 166 (p15): References 167 (p16): 3 Selection and Determination of Tubing and Production Casing Sizes 167 (p17): 3.1 Overview 168 (p18): 3.2 Overview of Nodal Analysis 170 (p19): 3.3 Selection and Determination of Tubing and Production Casing Sizes for Flowing Wells 179 (p20): 3.4 Selection and Determination of Tubing and Production Casing Sizes for Gas Wells 187 (p21): 3.5 Selection and Determination of Tubing and Production Casing Sizes for Artificial Lift Wells 206 (p22): 3.6 Effects of Stimulation on Tubing and Production Casing Size Selection 211 (p23): 3.7 Selection and Determination of Tubing and Production Casing Sizes for Heavy Oil and High Pour-Point Oil Production Wells 219 (p24): References 221 (p25): 4 Completion and Perforating Fluids 221 (p26): 4.1 Functions of Drilling and Completion Fluid and Basic Requirements 224 (p27): 4.2 Drilling and Completion Fluid Systems andApplication 233 (p28): 4.3 Shield-Type Temporary Plugging Technique 248 (p29): 4.4 Drilling and Completion Fluid for Complicated Reservoir 256 (p30): 4.5 Perforating Fluid 265 (p31): References 267 (p32): 5 Production Casing and Cementing...
备用文件名
zlibzh/no-category/万仁溥编, Renpu Wan, 万仁溥编, 万仁溥/现代完井工程 英文_118081063.pdf
备选标题
Advanced well completion engineering / monograph
备用出版商
Petroleum Industry Press
备用版本
China, People's Republic, China
备用版本
Di 1 ban, Beijing, 2012
元数据中的注释
Bookmarks: p1 (p1): INTRODUCTION
p2 (p6): 1 Basis of Well Completion Engineering
p3 (p6): 1.1 Grounds of Reservoir Geology and Reservoir Engineering
p4 (p17): 1.2 Core Analysis Techniques
p5 (p26): 1.3 Reservoir Sensitivity to Fluid and Working Fluid Damage Evaluation
p6 (p43): 1.4 Reservoir Stress Sensitivity Analysis
p7 (p59): 1.5 IN-SlTU Stress and Mechanical Parameters of Rock
p8 (p69): 1.6 Technological Grounds of Petroleum Production Engineering
p9 (p73): References
p10 (p77): 2 Well Completion Mode Selection
p11 (p77): 2.1 Vertical,Slant and Directional Well Completion
p12 (p119): 2.2 Horizontal Well Completion
p13 (p142): 2.3 Underbalanced Well Completion
p14 (p148): 2.4 Basic Requirements,Grounds and Flow Chart of Well Completion Mode Selection
p15 (p166): References
p16 (p167): 3 Selection and Determination of Tubing and Production Casing Sizes
p17 (p167): 3.1 Overview
p18 (p168): 3.2 Overview of Nodal Analysis
p19 (p170): 3.3 Selection and Determination of Tubing and Production Casing Sizes for Flowing Wells
p20 (p179): 3.4 Selection and Determination of Tubing and Production Casing Sizes for Gas Wells
p21 (p187): 3.5 Selection and Determination of Tubing and Production Casing Sizes for Artificial Lift Wells
p22 (p206): 3.6 Effects of Stimulation on Tubing and Production Casing Size Selection
p23 (p211): 3.7 Selection and Determination of Tubing and Production Casing Sizes for Heavy Oil and High Pour-Point Oil Production Wells
p24 (p219): References
p25 (p221): 4 Completion and Perforating Fluids
p26 (p221): 4.1 Functions of Drilling and Completion Fluid and Basic Requirements
p27 (p224): 4.2 Drilling and Completion Fluid Systems andApplication
p28 (p233): 4.3 Shield-Type Temporary Plugging Technique
p29 (p248): 4.4 Drilling and Completion Fluid for Complicated Reservoir
p30 (p256): 4.5 Perforating Fluid
p31 (p265): References
p32 (p267): 5 Production Casing and Cementing
p33 (p267): 5.1 Basic Requirements for Production Casing Design and Integrity Management of Production Casing
p34 (p275): 5.2 Hole Structure and Types of Casing
p35 (p285): 5.3 Strength of Casing and Strength Design of Casing String
p36 (p299): 5.4 Cementing
p37 (p315): 5.5 Production Casing and Cementing for Complex Type Wells
p38 (p334): References
p39 (p336): 6 Perforating
p40 (p336): 6.1 Perforating Technology
p41 (p354): 6.2 Factors of Influencing Perforated Well Productivity
p42 (p374): 6.3 Perforating Differential Pressure Design
p43 (p383): 6.4 Optimizing Perforation Design
p44 (p398): References
p45 (p401): 7 Well Completion Formation Damage Evaluation
p46 (p401): 7.1 Overview
p47 (p405): 7.2 Principle of Formation Damage Evaluation by Well Testing
p48 (p410): 7.3 Formation Damage Diagnosing in Homogeneous Reservoir by Graphic Characteristics
p49 (p420): 7.4 Graphic Characteristics of Dual Porosity Reservoirs and Reservoirs with Hydraulically Created Fracture
p50 (p433): 7.5 Distinction of Stimulation Effect by Graphic Characteristics
p51 (p440): 7.6 Quantitative Interpretation of Degree of Formation Damage
p52 (p450): 7.7 Well Logging Evaluation of Formation Damage Depth
p53 (p452): References
p54 (p454): 8 Measures for Putting Well into Production
p55 (p454): 8.1 Preparations before Putting into Production
p56 (p459): 8.2 Main Measures for Putting into Production
p57 (p463): 8.3 Physical and Chemical Blocking Removal
p58 (p479): 8.4 Hydraulic Fracturing for Putting into Production
p59 (p502): 8.5 Acidizing for Putting into Production
p60 (p526): 8.6 High Energy Gas Fracturing for Putting into Production
p61 (p543): 8.7 Flowing Back
p62 (p553): References
p63 (p555): 9 Well Completion Tubing String
p64 (p555): 9.1 Oil Well Completion Tubing String
p65 (p570): 9.2 Gas Well Completion Tubing String
p66 (p579): 9.3 Separate-LayerWater Injection String
p67 (p584): 9.4 Heavy Oil Production Tubing String
p68 (p589): 9.5 Completion Tubing String Safety System
p69 (p593): 9.6 Tubing String Mechanics
p70 (p599): References
p71 (p601): 10 Wellhead Assembly
p72 (p602): 10.1 Oil-Well Christmas Tree and Tubinghead
p73 (p615): 10.2 Gas-Well Christmas Tree and Tubinghead
p74 (p627): 10.3 Water Injection and Thermal Production Wellhead Assembly
p75 (p630): 10.4 Common Components of Wellhead Assembly
p76 (p646): References
p77 (p647): 11 Oil and Gas Well Corrosion and Corrosion Prevention
p78 (p647): 11.1 Related Calculation of Oil and GasWell Corrosion
p79 (p652): 11.2 Oil and GasWell Corrosion Mechanism and Classification
p80 (p667): 11.3 Material Selection for Corrosive Environment of Oil and Gas Wells
p81 (p684): 11.4 Oil and Gas Well Corrosion Prevention Design
p82 (p699): 11.5 Tubing and Casing Corrosion Prevention for Sour Gas Reservoir
p83 (p725): References
p2 (p6): 1 Basis of Well Completion Engineering
p3 (p6): 1.1 Grounds of Reservoir Geology and Reservoir Engineering
p4 (p17): 1.2 Core Analysis Techniques
p5 (p26): 1.3 Reservoir Sensitivity to Fluid and Working Fluid Damage Evaluation
p6 (p43): 1.4 Reservoir Stress Sensitivity Analysis
p7 (p59): 1.5 IN-SlTU Stress and Mechanical Parameters of Rock
p8 (p69): 1.6 Technological Grounds of Petroleum Production Engineering
p9 (p73): References
p10 (p77): 2 Well Completion Mode Selection
p11 (p77): 2.1 Vertical,Slant and Directional Well Completion
p12 (p119): 2.2 Horizontal Well Completion
p13 (p142): 2.3 Underbalanced Well Completion
p14 (p148): 2.4 Basic Requirements,Grounds and Flow Chart of Well Completion Mode Selection
p15 (p166): References
p16 (p167): 3 Selection and Determination of Tubing and Production Casing Sizes
p17 (p167): 3.1 Overview
p18 (p168): 3.2 Overview of Nodal Analysis
p19 (p170): 3.3 Selection and Determination of Tubing and Production Casing Sizes for Flowing Wells
p20 (p179): 3.4 Selection and Determination of Tubing and Production Casing Sizes for Gas Wells
p21 (p187): 3.5 Selection and Determination of Tubing and Production Casing Sizes for Artificial Lift Wells
p22 (p206): 3.6 Effects of Stimulation on Tubing and Production Casing Size Selection
p23 (p211): 3.7 Selection and Determination of Tubing and Production Casing Sizes for Heavy Oil and High Pour-Point Oil Production Wells
p24 (p219): References
p25 (p221): 4 Completion and Perforating Fluids
p26 (p221): 4.1 Functions of Drilling and Completion Fluid and Basic Requirements
p27 (p224): 4.2 Drilling and Completion Fluid Systems andApplication
p28 (p233): 4.3 Shield-Type Temporary Plugging Technique
p29 (p248): 4.4 Drilling and Completion Fluid for Complicated Reservoir
p30 (p256): 4.5 Perforating Fluid
p31 (p265): References
p32 (p267): 5 Production Casing and Cementing
p33 (p267): 5.1 Basic Requirements for Production Casing Design and Integrity Management of Production Casing
p34 (p275): 5.2 Hole Structure and Types of Casing
p35 (p285): 5.3 Strength of Casing and Strength Design of Casing String
p36 (p299): 5.4 Cementing
p37 (p315): 5.5 Production Casing and Cementing for Complex Type Wells
p38 (p334): References
p39 (p336): 6 Perforating
p40 (p336): 6.1 Perforating Technology
p41 (p354): 6.2 Factors of Influencing Perforated Well Productivity
p42 (p374): 6.3 Perforating Differential Pressure Design
p43 (p383): 6.4 Optimizing Perforation Design
p44 (p398): References
p45 (p401): 7 Well Completion Formation Damage Evaluation
p46 (p401): 7.1 Overview
p47 (p405): 7.2 Principle of Formation Damage Evaluation by Well Testing
p48 (p410): 7.3 Formation Damage Diagnosing in Homogeneous Reservoir by Graphic Characteristics
p49 (p420): 7.4 Graphic Characteristics of Dual Porosity Reservoirs and Reservoirs with Hydraulically Created Fracture
p50 (p433): 7.5 Distinction of Stimulation Effect by Graphic Characteristics
p51 (p440): 7.6 Quantitative Interpretation of Degree of Formation Damage
p52 (p450): 7.7 Well Logging Evaluation of Formation Damage Depth
p53 (p452): References
p54 (p454): 8 Measures for Putting Well into Production
p55 (p454): 8.1 Preparations before Putting into Production
p56 (p459): 8.2 Main Measures for Putting into Production
p57 (p463): 8.3 Physical and Chemical Blocking Removal
p58 (p479): 8.4 Hydraulic Fracturing for Putting into Production
p59 (p502): 8.5 Acidizing for Putting into Production
p60 (p526): 8.6 High Energy Gas Fracturing for Putting into Production
p61 (p543): 8.7 Flowing Back
p62 (p553): References
p63 (p555): 9 Well Completion Tubing String
p64 (p555): 9.1 Oil Well Completion Tubing String
p65 (p570): 9.2 Gas Well Completion Tubing String
p66 (p579): 9.3 Separate-LayerWater Injection String
p67 (p584): 9.4 Heavy Oil Production Tubing String
p68 (p589): 9.5 Completion Tubing String Safety System
p69 (p593): 9.6 Tubing String Mechanics
p70 (p599): References
p71 (p601): 10 Wellhead Assembly
p72 (p602): 10.1 Oil-Well Christmas Tree and Tubinghead
p73 (p615): 10.2 Gas-Well Christmas Tree and Tubinghead
p74 (p627): 10.3 Water Injection and Thermal Production Wellhead Assembly
p75 (p630): 10.4 Common Components of Wellhead Assembly
p76 (p646): References
p77 (p647): 11 Oil and Gas Well Corrosion and Corrosion Prevention
p78 (p647): 11.1 Related Calculation of Oil and GasWell Corrosion
p79 (p652): 11.2 Oil and GasWell Corrosion Mechanism and Classification
p80 (p667): 11.3 Material Selection for Corrosive Environment of Oil and Gas Wells
p81 (p684): 11.4 Oil and Gas Well Corrosion Prevention Design
p82 (p699): 11.5 Tubing and Casing Corrosion Prevention for Sour Gas Reservoir
p83 (p725): References
元数据中的注释
related_files:
filepath:13169891.zip — md5:0dc02f155d7624d51d774f5d74e12553 — filesize:105653931
filepath:13169891.zip — md5:5c5561b28k6be2fa75c2603494dc82b2 — filesize:105653931
filepath:13169891.zip — md5:a35ec7f5981729865e355ba739823ddd — filesize:105653931
filepath:/读秀/读秀3.0/读秀/3.0/3.0新/其余书库等多个文件/0025/05/13169891.zip
filepath:/读秀/读秀4.0/读秀/4.0/数据库19-2/13169891.zip
filepath:第四部分/aaa/05/13169891.zip
filepath:13169891.zip — md5:0dc02f155d7624d51d774f5d74e12553 — filesize:105653931
filepath:13169891.zip — md5:5c5561b28k6be2fa75c2603494dc82b2 — filesize:105653931
filepath:13169891.zip — md5:a35ec7f5981729865e355ba739823ddd — filesize:105653931
filepath:/读秀/读秀3.0/读秀/3.0/3.0新/其余书库等多个文件/0025/05/13169891.zip
filepath:/读秀/读秀4.0/读秀/4.0/数据库19-2/13169891.zip
filepath:第四部分/aaa/05/13169891.zip
开源日期
2024-06-13
🚀 快速下载
成为会员以支持书籍、论文等的长期保存。为了感谢您对我们的支持,您将获得高速下载权益。❤️
如果您在本月捐款,您将获得双倍的快速下载次数。
🐢 低速下载
由可信的合作方提供。 更多信息请参见常见问题解答。 (可能需要验证浏览器——无限次下载!)
- 低速服务器(合作方提供) #1 (稍快但需要排队)
- 低速服务器(合作方提供) #2 (稍快但需要排队)
- 低速服务器(合作方提供) #3 (稍快但需要排队)
- 低速服务器(合作方提供) #4 (稍快但需要排队)
- 低速服务器(合作方提供) #5 (无需排队,但可能非常慢)
- 低速服务器(合作方提供) #6 (无需排队,但可能非常慢)
- 低速服务器(合作方提供) #7 (无需排队,但可能非常慢)
- 低速服务器(合作方提供) #8 (无需排队,但可能非常慢)
- 低速服务器(合作方提供) #9 (无需排队,但可能非常慢)
- 下载后: 在我们的查看器中打开
所有选项下载的文件都相同,应该可以安全使用。即使这样,从互联网下载文件时始终要小心。例如,确保您的设备更新及时。
外部下载
-
对于大文件,我们建议使用下载管理器以防止中断。
推荐的下载管理器:JDownloader -
您将需要一个电子书或 PDF 阅读器来打开文件,具体取决于文件格式。
推荐的电子书阅读器:Anna的档案在线查看器、ReadEra和Calibre -
使用在线工具进行格式转换。
推荐的转换工具:CloudConvert和PrintFriendly -
您可以将 PDF 和 EPUB 文件发送到您的 Kindle 或 Kobo 电子阅读器。
推荐的工具:亚马逊的“发送到 Kindle”和djazz 的“发送到 Kobo/Kindle” -
支持作者和图书馆
✍️ 如果您喜欢这个并且能够负担得起,请考虑购买原版,或直接支持作者。
📚 如果您当地的图书馆有这本书,请考虑在那里免费借阅。
下面的文字仅以英文继续。
总下载量:
“文件的MD5”是根据文件内容计算出的哈希值,并且基于该内容具有相当的唯一性。我们这里索引的所有影子图书馆都主要使用MD5来标识文件。
一个文件可能会出现在多个影子图书馆中。有关我们编译的各种数据集的信息,请参见数据集页面。
有关此文件的详细信息,请查看其JSON 文件。 Live/debug JSON version. Live/debug page.